Air Separator Set Up

The Fisher Air Separator can be set up in as little as two hours.

leveling the ground Step 1: Level the ground
leveled separator Step 2: Block and level the separator
removing the conveyors Step 3: Remove the conveyors and electrical panel
electrical panel Step 4: Connect the electrical panel to the electrical source
lifting the separator Step 5: With proper motor rotation obtained, turn on the hydraulic system, lifting the separator into position
mounting the conveyors Step 6: Mount the conveyors and you are ready to begin separating!

*Be sure to consult the user's manual for more detailed instructions
This email address is being protected from spambots. You need JavaScript enabled to view it.us to request access to our equipment manuals/parts books

back to Air Separators